  • Clapboard Complete

    Clapboard Complete

    Installation of clapboard is complete! All four façades of Rosslyn’s icehouse are now handsomely clad in cedar, primed and painted before installation, ready for nailhead touchup as temperature rises in the weeks ahead. Especial accolades are due Supi and Peter who stayed late last night to finish all but the last four boards at the…

  • T&G Nickel Gap Progress

    T&G Nickel Gap Progress

    Time for a nickel gap progress report. But first let’s backfill slightly. As you may recall, we decided to finish the icehouse interior in T&G nickel gap instead of shiplap. We estimated and re-estimated material, ordered it from of T&G from Haselton’s, waited a couple of weeks for milling and delivery, and then offsite material…

  • Field Notes & Punch Lists

    Field Notes & Punch Lists

    So many photos and field notes and punch lists, marked up plans, pruned and grafted scopes of work. This is the ephemera of construction and the detritus of rehabilitation. A midden of sketches and diagrams, souvenirs of collaborative problem solving, artifacts of alterations and adjustments,… this is the tangled and layered chorus we seek to…

  • Elevation Headway

    Elevation Headway

    It was a super Saturday for Rosslyn’s icehouse rehab. Several concurrent projects underway, but the most notable progress was the interior east elevation (in the loft) and the exterior west elevation. I’ll try to get out of the way and let the photos do the talking. The photo above is taken from the northwest of…

  • Icehouse Trim and Clapboard Installation

    Icehouse Trim and Clapboard Installation

    Today I’m pleased to post a quick update on the icehouse trim and clapboard installation. Temperate conditions are proving a bonus to this exciting progress. In the photo above Matt and Supi are wrapping up with the new trim so that the Benjamin Obdyke Slicker and clapboard can be installed. The unique, vertically-channeled, three-dimensional matrix of Slicker® Classic…

  • Boathouse Repairs 5: Piece-by-Piece

    Boathouse Repairs 5: Piece-by-Piece

    As temperatures drop and winter weather threatens, Peter and Supi are toiling against the onset of winter. They’re taking advantage of shop work when possible, fabricating post bases — piece-by-piece — painstaking duplicating our boathouse‘s existing post and railing details while ensuring the most hardy, weatherproof construction possible to ensure the longevity of these handsome…

  • Boathouse Repairs 4: Redecking Complete

    Boathouse Repairs 4: Redecking Complete

    More good news on Rosslyn’s boathouse gangway repair project: redecking is complete. The necessary mechanical adjustments were made, sleeper joists were properly flashed, decking was consistently spaced, the correct number of posts were installed in a structurally sound manner, and the redecking was actually completed. Eureka! It’s a pleasure and a privilege to celebrate yet…

  • Boathouse Repairs 3: Fabricating Post Wraps

    Boathouse Repairs 3: Fabricating Post Wraps

    It’s time for a progress report on Rosslyn’s boathouse post fabrication. Peter Vaiciulis and Sia Supi Havosi have been beavering away lakeside as autumn blurs into winter. Unfortunately, their decking progress has been stalled because the moisture content of the lumber is still too high. In contrast to the previous contractor whose work required extensive…

  • Icehouse Rehab 4.5: Foundation Collaboration

    Icehouse Rehab 4.5: Foundation Collaboration

    Last Friday I gushed that it’d been a monumental week. No hyperbole. Tackling (and completing) Rosslyn’s icehouse foundation was an epic accomplishment, a concrete collaboration conjoining two separate teams to rescue the foundering concrete project. And while Friday’s post was brief, timely-but-abbreviated recognition for the indefatigable individuals who pulled off this remarkable feat, today I’ll…

  • Team Barbecue: Cheers!

    Team Barbecue: Cheers!

    Another short and sweet post to mark the end-of-week team barbecue. With four fifths of the icehouse concrete dream team present (Tony was unable to join), it was a well earned chance to take a break from work and celebrate. Susan and I are profoundly grateful for the problem solving and priority juggling and camaraderie…

  • Icehouse Rehab 4: Concrete Work Complete

    Icehouse Rehab 4: Concrete Work Complete

    It’s been another monumental week! After the concrete subcontractor melted down a week ago, mere days before starting work on the icehouse, our in-house team decided to undertake the foundation and slab themselves. Today I can report with profound pride and pleasure that it was a total success. The crew is gathering tomorrow to celebrate…

  • Boathouse Repairs 2: Boathouse Gangway Posts & Pier Cladding

    Boathouse Repairs 2: Boathouse Gangway Posts & Pier Cladding

    Photo essay showcasing progress on Rosslyn’s boathouse repairs made Peter Vaiciulis and Sia Supi Havosi last week.