Tag: Peter Vaiciulis

  • Move-In Begins

    Move-In Begins

    At last, icehouse move-in begins! We’re not yet 100% finished with the icehouse rehab, but we’re close. Really, really close. Inside, at least. Outside, less so. Plenty of hardscaping and landscaping still in the works. But the interior is super close. I need to put the finishing touches on my loft cabinetry, and Peter needs…

  • Drawers and Cabinet Doors

    Drawers and Cabinet Doors

    As we advance upon the finish line — sometimes hurtling, sometimes inchworming — each of us is exercising our agility, stretching our purviews, and adapting to the evolving needs of the icehouse rehabilitation project. And, with the interior almost complete, I tip my gratitude cap to Peter whose been fabricating drawers and cabinet doors on-site…

  • Grateful, Part II

    Grateful, Part II

    Another worrisome day as Lake Champlain water level continues to rise. Hoping it’ll crest soon, and we can return to midsummer jolliness. Until I can celebrate *THAT* good news, I’ll elevate my spirits with a sequel to yesterday’s “Grateful, Part I” (which suffered premature abbreviation when I ran out of time.) Peter joined us last…

  • Icehouse Stairway Update

    Icehouse Stairway Update

    Spoiler Alert: the icehouse stairway is not 100% complete. Yet. But it will be. Soon. I hope! There’s still an itty-bitty electrical wrapup (finishing up the riser lighting installation), but the main hurdle — one that’s been delayed again and again since winter — is the banister. Handrails and balusters. Everything’s been fabricated for a…

  • Finishing Floor & Staircase

    Finishing Floor & Staircase

    Finishing, not finished. Yet. But soon. I hope! The icehouse main floor and staircase are slinking slowly toward completion. Sashaying? No. Sauntering. Slowly sauntering. But at last I can say that we’re finishing the floor and the staircase in Rosslyn’s icehouse. We’ve been using Safecoat® Polyureseal BP to seal our hardwood floors for about twenty…

  • West Elevation Doorway Installed

    West Elevation Doorway Installed

    I’m thrilled to showcase the icehouse’s west facade with new double doors flanked with full-height side lites. What a transformation. With the west elevation doorway installed we’re approaching the point where reality resembles Tiho’s renderings. Remember that west elevation drawing Tiho created to help the team visualize where we were headed? The image below captures…

  • Garapa Paneled Bathroom, Pt. 1

    Garapa Paneled Bathroom, Pt. 1

    Eureka! After many months of brainstorming, experimentation, painstakingly protracted preparation, troubleshooting, oiling, and meticulous installation, the garapa paneling in Rosslyn’s icehouse bathroom is complete. What a remarkable journey it’s been, and the final results are breathtaking. Garapa Backstory Our garapa backstory has its beginning waaayyy back when we built the original garapa deck on the…

  • Flooring Sneak Peek

    Flooring Sneak Peek

    It’s a little premature to start celebrating the soon-to-be-completed hardwood flooring in the icehouse. With only the first two rows installed (and a third in the works), a superstitious soul might delay an update in the interest of humility (or outwitting fate). But it’s been so many months in the planning and preparation that I’ve…

  • Concrete Slab Finale

    Concrete Slab Finale

    We’ve bookended our concrete work for the icehouse rehab with last autumn’s foundation and slab and concluding with a concrete slab finale for the hot tub and the mini split. And I am going to let the photos. Tell the story since today’s post is best narrated with a photo essay. But first we celebrate…

  • Hot Tub Wiring

    Hot Tub Wiring

    Many new and exciting thresholds crossed today. Supi, Calvin, and Tony started the stone hardscape project. Peter and Justin installed the columns and book matched ash transition upon which they rest. We finalized the shower glass order, and we *almost* finalized the coffee bar countertop stone. Eric arrived at the halfway point in the bathroom…

  • East Door Installed

    East Door Installed

    Rosslyn’s icehouse looks a little different this evening. The east entrance door was installed by Peter, subtly transforming the most visible elevation of the building and finally illuminating the entrance hallway with natural light after months in a “cloistered” work environment without any natural light. Although there remains some additional shimming and trimming (plus removing…

  • The Art of Thresholds

    The Art of Thresholds

    I’m slightly obsessed with transitions and betweenness. Liminality and interstices. Metamorphosis, reawakening, and transformation inevitably weave themselves into my words about gardening and historic rehabilitation. In fact, in a not altogether exaggerated sense, Rosslyn Redux is a kind of carefree contemplation of thresholds, the art of thresholds, and the artifacts of crossing thresholds… Transitions. Flux.…