    As we hurdle toward the homestretch on the icehouse rehab I find myself re-visiting and fine-tuning finish details to accommodate subtle discrepancies between plans and field conditions. Or sometimes it’s just a matter of little tweaks that pop up as envisioned and imagined circumstances metamorphose into reality. Today I’ve sketched a new iteration, a little…

  • Elm and Garapa Threshold

    A Jeroboam of gratitude to Peter Vaiciulis for agreeing to fabricate a custom elm and garapa threshold for the icehouse bathroom doorway. Conjoining two two dissimilar hardwoods is challenging enough, but I added an extra detail (or two) that you just might be able to spot in the photo below. The strip of garapa (closer…

  • Garapa Roundover: Easing the Edge

    Garapa Roundover: Easing the Edge

    Time for a progress report on the garapa paneling that will soon embellish the icehouse bathroom. We started out gently easing the edges, but several iterations later we’ve settled on a full roundover. Here’s why… Roundover Rewind Because the garapa upcycling backstory helps illuminate the decision to edge these boards with a diminutive roundover, let’s…

  • Synchronous Progress

    Synchronous Progress

    It’s been a good week, and it’s not even over yet. Much gratitude is due the entire team as we move into a Friday with many moving parts and a growing balance sheet of synchronous progress in the icehouse, outside the icehouse, and throughout Rosslyn’s still muddy but increasingly springlike grounds. A photo essay (think…

  • Icehouse Hardscape

    Icehouse Hardscape

    In some respects, the most significant icehouse rehab alteration, at least to the exterior and surroundings, is the grade change north and west of the existing building and the new hardscape that will integrate this area with the rest of Rosslyn’s lawns and gardens. In the collage above, an interesting perspective captured with a drone…

  • Double Sunburst

    Double Sunburst

    Today’s post is a tribute to our Rosslyn forebear, George McNulty, from whom we inherited a whimsical double sunburst motif on the west façade of Rosslyn’s ell, and Peter Vaiciulis who fabricated a slightly downscaled sister embellishment for the east façade of the icehouse. This twist on a familiar Essex architectural theme, the sunburst motif…

  • Clapboard Complete

    Clapboard Complete

    Installation of clapboard is complete! All four façades of Rosslyn’s icehouse are now handsomely clad in cedar, primed and painted before installation, ready for nailhead touchup as temperature rises in the weeks ahead. Especial accolades are due Supi and Peter who stayed late last night to finish all but the last four boards at the…

  • Searching for Poetry

    Searching for Poetry

    Searching for poetry, questing for questions that need no answers to matter and guide and enrich. This might be my epitaph. Some day. But not yet. I hope. Today, the vernal equinox, I awoke at 4:00 AM, eager to start cooking a wild boar roast I had thawed. Actually it wasn’t the roast that caffeinated…

  • T&G Nickel Gap Progress

    T&G Nickel Gap Progress

    Time for a nickel gap progress report. But first let’s backfill slightly. As you may recall, we decided to finish the icehouse interior in T&G nickel gap instead of shiplap. We estimated and re-estimated material, ordered it from of T&G from Haselton’s, waited a couple of weeks for milling and delivery, and then offsite material…

  • Saturday Siding

    Saturday Siding

    Some weekends are for relaxing or fêting friends. Other weekends are for backcountry adventures or polar plunges in currently 35° Lake Champlain. But today was dedicated to cladding — T&G paneling inside the icehouse and clapboard outside the outhouse — with four dedicated members of Rosslyn’s icehouse rehab team swapping R&R for punch list productivity.…

  • Elevation Headway

    Elevation Headway

    It was a super Saturday for Rosslyn’s icehouse rehab. Several concurrent projects underway, but the most notable progress was the interior east elevation (in the loft) and the exterior west elevation. I’ll try to get out of the way and let the photos do the talking. The photo above is taken from the northwest of…

  • Tongue and Groove Nickel Gap Installation Begins

    Tongue and Groove Nickel Gap Installation Begins

    Hurrah! As of today we’ve begun installing tongue and groove nickel gap (aka “nickel gap” T&G) in the icehouse loft. Kudos to Matt Sayward for initiating tongue and groove nickel gap installation in the icehouse today. With Peter Vaiciulis guiding (and weeks’ worth of prepping, priming, and painting the paneling almost complete) we’ve launched a…